
POWER RATES
POWER ADVISORIES
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more
NEWS AND UPDATES
ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 37 recipients of 2023 Barangay Line Enhancement Program (BLEP) of Maliog-liog Island, Concepcion on April 16, 2024 (Wednesday). The National Electrification Administration (NEA) appropriated budget to electrify five (5) island barangays with 1,477 households within ILECO III area coverage for the year. This program aims… Read more
VENUE 1 (HOST) ILECO III Main Office Preciosa, Sara, Iloilo Sara Area Coverage (Sara, Lemery, Ajuy, San Dionisio and Concepcion) VENUE 2 Balasan Civic Center Pob. Sur, Balasan, Iloilo Pani-an Area Coverage (Balasan, Carles, Batad and Estancia) VENUE 3 Barotac Viejo Municipal Gymnasium Pob., Barotac Viejo, Iloilo Natividad Area Coverage (Barotac Viejo, San Rafael, Anilao… Read more
For everyone’s information. Update on Visayas grid status, 17 April 2024: Red alert 5:00PM-9:00PM Yellow alert 9:00PM-10:00PM Red alert status is raised in the Visayas grid due to the reduced output of MVIP brought about by the tripping of GNPK 2 (138MW) & SMCPC U2 (135MW). Manual load dropping or rotational power interruptions may be… Read more
Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang sang ano man nga mga bagay sa metro ukon kuntador. ILLEGAL/ DIRECT TAPPING – Pagtakod sang serbisyo sang kuryente nga wala naga-agi sa kuntador. Mga penalidad kung maglapas sa… Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more