What: Rotational Brownout because of load shedding within ILECO III Area Coverage
Date: May 13, 2026 (Wednesday)
Time within 4:00 PM- 8:00 PM
Areas Affected : ILECO III Area Coverage
Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP)
This rotational brownout due to manual load dropping is beyond the control of ILECO III.

