For everyone’s information.

Update on Visayas grid status, 17 April 2024:

Red alert

5:00PM-9:00PM

Yellow alert

9:00PM-10:00PM

Red alert status is raised in the Visayas grid due to the reduced output of MVIP brought about by the tripping of GNPK 2 (138MW) & SMCPC U2 (135MW).

Manual load dropping or rotational power interruptions may be implemented to protect the integrity of the power system.

A red alert status is issued when power supply is insufficient to meet consumer demand and the transmission grid’s regulating requirement.