What: Rotational Brownout because of load shedding within ILECO III Area Coverage
Date: May 13, 2026 (Wednesday)
Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable)
Areas Affected : ILECO III Area Coverage
Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP)
This rotational brownout due to Manual Load Dropping is beyond the control of ILECO III.
This rotational brownout due to manual load dropping is beyond the control of ILECO III.
