• NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more

  • LOOK: ILECO III IS HIRING!

    CONSUMER ACCOUNTS COORDINATOR (Meter Reader) See below for the qualifications and requirements to be submitted by July 15, 2024 or contact us at (033) 392-0202. Join us! Become a part of our family. Read more

  • ENERGY CONSERVATION TIP

    Ka-MCO! Looking for ways to save energy and money at home?Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Read more

  • LINEMAN, “YOU’RE THE MAN” PHOTOGRAPHY CONTEST

    Lineman, You’re the Man Photography Contest is an avenue to give thanks and recognition to our brave linemen and showing how electricity has made an impact on the lives of the MCOs and the community. CRITERIA FOR JUDGING Relevance to the Objective – 40% – The entry exhibits and higlights the role of linemen, their… Read more

  • Ka-MCO! Nahibaluan mo bala kung diin nagahalin ang imo gina kunsomo nga kuryente sa imo panimalay?

    Si ILECO III bala ang naga produser sang kuryente? ukon ang mga planta sang kuryente ang naga produser sini? Isa lang ina sa mga pamangkutanon sang aton Miyembo-Konsumidor kag iban nga mga pamatan-on, kag aton ini iga pat-pat ang gina halinan sang aton kuryente nga gina distribute sa inyo mga panimalay. Iba ang may alam… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more