• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022 Time of interruption: 3:50 PM Time of Restoration: 4:20 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Seaside Gasoline Station, Estancia (Private Transformer) We apologize for the inconvenience. For your information. Read more

  • Update on Unscheduled Power Interruption on Sara Feeder 1

    Time Restored: 7:18 PM Cause of Interruption: Line fault due to vegetation (Coconut Tree was leaning on our Primary Line located at Brgy. Devera, Sara. Thank you for your understanding. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    A Friendly Reminder from ILECO III Read more

  • ANO ANG MANUAL LOAD DROPPING O MLD ?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “Rotational Brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • PANTAWID LIWANAG PROGRAM PHASE 5 GIN PATIGAYON SANG ILECO III SA 2 KA BARANGAY SA ILA AREA COVERAGE

    Sa ika-lima (5) ka beses, nangin madinalag-on liwat ang ginhiwat nga Pantawid Liwanag Program (PLP) cash assistance sa idalum sang programa nga Assistance for Indigents in Crisis Situation ukon (AICS) sang Department of Social Welfare and Development. Ang funding sa sini nga programa natigayon sa pagpanikasog man sang aton APEC Partylist. Ang mga benepisyaryo sang… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more