• NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024)

    Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined… Read more

  • ANO ANG RA 11552?

    An Act Extending and Enhancing the Implementation of the Lifeline Rate, Amending for the Purpose, Section 73 of Republic Act No. 9136, Otherwise known as the ‘Electric Power Industry Reform Act of 2001’ as Amended by Republic Act No. 10150 1. Ano ang Lifeline Rate kag ano ang benepisyo sa mga kwalipikado nga mga kunsomidor?… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR BARANGAY LINE ENHANCEMENT PROGRAM (BLEP) RECIPIENTS IN MANLOT ISLAND, CARLES, ILOILO

    ILECO III personnel conducted on-site Pre-Membership Seminar (PMS) to 387 recipients of Barangay Line Enhancement Program (BLEP) of Talingting Island, Carles, Iloilo on November 05, 2024 (Tuesday). The said meeting was also attended by barangay officials headed by Punong Barangay Hon. Gigi D. Gonzales. The National Electrification Administration (NEA) appropriated budget to electrify nine (9)… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN STO. TOMAS, BAROTAC VIEJO, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 66 attendees in Brgy. sto. Tomas, Barotac Viejo, Iloilo on November 05, 2024 (Tuesday). The said meeting was also attended by barangay officials headed by Punong Barangay Hon. Remo Batacandolo. This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN BAROTAC VIEJO, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 84 attendees from barangays of Dela Pena, San Miguel and Nagpana held in Brgy. Dela Pena, Barotac Viejo, Iloilo on November 04, 2024 (Monday). The said meeting was attended by Dir. Harry G. Tupas. This activity is made possible with the support of ILECO III BODs… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more