• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 22, 2026 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang masunod: • Aglosong Madamo gid nga salamat sa… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more

  • MEDICAL MISSION SA OKTUBRE 28, 2022 SA ILECO III GYMNASIUM

    Pahibalo sa tanan nga member-consumer-owners kag stakeholders sang ILECO III. ANO: MEDICAL MISSIONDIIN: ILECO III Gymnasium, Brgy. Preciosa, Sara, IloiloSAN-O: Oktubre 28, 2022 (BIYERNES), 9:00 AM – 1:00 PM Para sa dugang nga kasayuran nahanungod sa mga proseso sa adlaw sang Medical Mission kag iban pa nga mga palamangkutanon, magpadulong lamang sa reception/registration area nga… Read more

  • BILLING ADVISORY

    PAHIBALO SA MGA KATAPO-KONSUMIDORES SANG ILECO III Para sa mga individual Member-Consumer-Owners, puwede na makabayad sang ILECO III bills sa BDO Unibank pinaagi sa Online Banking kag Over-the-Counter antes ukon sa natalana nga due date. Puwede man kamo sa gihapon makabayad sa mga masunod nga accredited payment centers sang ILECO III antes ukon sa natalana… Read more

  • ILECO III ENERGY SAVING TIP

    Pag-siguro sang maayo nga insulation sang mga connection sang kuryente sa balay.Magtawag sang accredited barangay electrician para ma check ang inyo nga linya. *A friendly reminder from ILECO III. Read more

  • ILECO III CONDUCTED COORDINATION MEETING WITH BARANGAY CAPTAINS OF RECIPIENT BARANGAYS FOR THE IMPLEMENTATION OF SITIO ELECTRIFICATION PROGRAM (SEP) 2022

    The meeting was held at ILECO III Covered Gym, today October 18, 2022. It was spearheaded by our General Manager Atty. James G. Balsomo II with ILECO III personnel. The meeting aims to inform the Punong Barangays about the details of the aforementioned program and also on how they can help in the successful implementation… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more