• NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • PAANO ANG PAG-REPORT SANG COMPLAINTS SA ILECO III?

    1. Magtawag ukon mag-text.ILECO III Contact Numbers:SARA AREA OFFICE – 0919-069-7391NATIVIDAD AREA OFFICE – 0919-069-7403PANI-AN AREA OFFICE – 0919-069-7396Kalakip ang mga masunod nga impormasyon:PANGALAN kag ADDRESS 2. Magpadala sang mensahe sa ILECO III Facebook Page.Kalakip ang mga masunod nga impormasyon:PANGALANADDRESSCONTACT NUMBER 3. Magbisita sa Area Office.ILECO III OFFICE HOURS:LUNES- BIYERNES8:00 AM- 5:00 PM12:00 NN- LUNCHBREAK… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo sa mga katapo-kunsumidores sang aton Kooperatiba nga nag-trip/shut down ang power plant sang Panay Energy Development Corporation (PEDC) Unit 3. Bangud sini, kulang ang supply sang kuryente sa isla sang Panay nga posible magresulta sa pag-implementar sang MANUAL LOAD DROPPING (MLD) base sa advice sang National Grid Corporation of the Philippines (NGCP). Sa sini… Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more