• UNSCHEDULED POWER INTERRUPTION (AUGUST 13, 2022)

    Date: August 13, 2022 Time of interruption: 4:00 PM Time of Restoration: 4:35 PM Reason: Line fault due to vegetation Affected Area: Nabitasan, Balasan Activity: Inspection/clearing of lines and re-fusing We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 13, 2022)

    Date: August 13, 2022 Time of interruption: 1:58 PM Time of Restoration: 2:37 PM Reason: Line fault due to vegetation Affected Area: Magdalo, Bariga, Dela Paz, Juanico, Bobon, Managopaya and Sitio Insayawan, Dela Paz, Banate Activity: Inspection/clearing of lines and re-fusing cut-out trip off of A, B and C sectionalizing cut-out at Magdalo, Banate We… Read more

  • TROUBLESHOOTING OF LOW VOLTAGE KWHR METER IN A POLE AT DAAN BANWA, ESTANCIA

    ILECO III personnel conducted troubleshooting of low voltage kWhr Meter in a pole at Daan Banwa, Estacia today, August 13, 2022 (Saturday). Keep safe Warriors of Light For your information. https://www.facebook.com/watch/?v=386531970165662 Read more

  • ANO ANG MANUAL LOAD DROPPING O MLD ?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “Rotational Brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • PANTAWID LIWANAG PROGRAM PHASE 5 GIN PATIGAYON SANG ILECO III SA 2 KA BARANGAY SA ILA AREA COVERAGE

    Sa ika-lima (5) ka beses, nangin madinalag-on liwat ang ginhiwat nga Pantawid Liwanag Program (PLP) cash assistance sa idalum sang programa nga Assistance for Indigents in Crisis Situation ukon (AICS) sang Department of Social Welfare and Development. Ang funding sa sini nga programa natigayon sa pagpanikasog man sang aton APEC Partylist. Ang mga benepisyaryo sang… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO PANG-PANG, SANTIAGO, BAROTAC VIEJO

    The roving community pantry of ILECO III “Love on Wheels” goes to Sitio Pang-pang, Santiago, Barotac Viejo, Iloilo on June 01, 2022 (Wednesday). ILECO III prepared grocery items and packs of rice and generously extended assistance to fifty (50) BAPA members of the said sitio. It was assisted by OIC-NAO Manager Ma. Angela P. Resano… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more