• UNSCHEDULED POWER INTERRUPTION (AUGUST 14, 2022)

    Date: August 14, 2022 Time of interruption: 8:56 AM Time of Restoration: 10:01 AM Reason: Transient line fault Affected Area: Bulak Sur, Batad Activity: Inspection of lines and re-fusing We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA AGOSTO 18 KAG 19, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa BANATE amo ang masunod: PETSA, ORAS KAG APEKTADO NGA LUGARAGOSTO 18, 2022 (HUWEBES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Sitio Bariga Sulod, Bariga… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 13, 2022)

    Date: August 13, 2022 Time of interruption: 5:20 PM Time of Restoration: 6:05 PM Affected Area: Portion of NHA Village, Dayhagan, Carles Activity: Inspection of lines and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ANO ANG MANUAL LOAD DROPPING O MLD ?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “Rotational Brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • PANTAWID LIWANAG PROGRAM PHASE 5 GIN PATIGAYON SANG ILECO III SA 2 KA BARANGAY SA ILA AREA COVERAGE

    Sa ika-lima (5) ka beses, nangin madinalag-on liwat ang ginhiwat nga Pantawid Liwanag Program (PLP) cash assistance sa idalum sang programa nga Assistance for Indigents in Crisis Situation ukon (AICS) sang Department of Social Welfare and Development. Ang funding sa sini nga programa natigayon sa pagpanikasog man sang aton APEC Partylist. Ang mga benepisyaryo sang… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO PANG-PANG, SANTIAGO, BAROTAC VIEJO

    The roving community pantry of ILECO III “Love on Wheels” goes to Sitio Pang-pang, Santiago, Barotac Viejo, Iloilo on June 01, 2022 (Wednesday). ILECO III prepared grocery items and packs of rice and generously extended assistance to fifty (50) BAPA members of the said sitio. It was assisted by OIC-NAO Manager Ma. Angela P. Resano… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more