• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • NGCP’s SCHEDULED POWER INTERRUPTION

    Date: May 03, 2025 (Saturday) Time: 2:00 AM-2:00 PM (12 hour duration) Affected areas: ANILAO, BANATE, BAROTAC VIEJO & SAN RAFAEL For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Kuha-on sa saksakan ang mga appliances nga wala ginagamit. *A friendly reminder from ILECO III. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BATITI, CONCEPCION, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Batiti, Concepcion, Iloilo on June 27, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred (100) member-consumer-owners (MCOs) of the said barangay. In addition, ILECO III also conducted Information Education Campaign (IEC) Program… Read more

  • ILECO III ENERGY SAVING TIP

    Pag-gamit sang energy efficient nga appliances kag pag-gamit sang mga LED bulbs. *A friendly reminder from ILECO III. Read more

  • IEC AND BAPA GENERAL ASSEMBLY IN HACIENDA RICA, BADIANG, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Hacienda Rica, Badiang, Anilao, Iloilo attended by15 MCOs on June 24, 2022 (Friday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more