• EMERGENCY POWER INTERRUPTION

    EMERGENCY POWER INTERRUPTION IN NATIVIDAD AREA COVERAGE DUE TO NGCP’s AUTOMATIC LOAD DROPPING DATE: May 23, 2024 (Thursday) TIME OF POWER INTERRUPTION: 4:16 PM Estimated time for power restoration is not specified by NGCP. AFFECTED AREAS: Anilao, Banate, Barotac Viejo & San Rafael REASON: Automatic Load Dropping due to deficiency in supply in the Visayas Read more

  • UPDATE FROM NGCP

    For your information. https://www.facebook.com/NGCPph/posts/pfbid036XTM9viQuwy8zrSwX4bKecvXwrvhug79qZm45ufLfLx2Xk6rYhj3HZWVaBtx5s7Gl Read more

  • GRID ALERT STATUS FROM NGCP AS OF MAY 23, 2024, 9:16 AM

    FOR YOUR INFORMATION. https://www.facebook.com/NGCPph/posts/pfbid02ENeJ9sMDnqejWjdBeg7Ww7pNbnUg4NmGxApv9PzUrqWxY5Q31zo9VE3Zcg8jJadBl Read more

  • LOOK: ILECO III nagapabilin nga ISO 9001:2015 Certified sa ika-duwa nga Surveillance Audit sang DQS Philippines.

    Sa ginpatigayon nga ISO Surveillance sang DQS Certification Phils., Inc. and IQNET LTD sang Pebrero 27, 2025 (Huwebes), liwat nga madinalag-on nga malampuwasan sang ILECO III ang nasambit nga audit sa diin nagapabilin nga labing una kag naga-isahanon nga power distribution utility sa Western Visayas nga ISO Certified. Ini bangud sang epektibo nga pag-implementar kag Read more

  • PUBLIC ADVISORY PRESS RELEASE

    PAHIBALO SA MGA KATAPO-KUNSOMIDOR SANG ILECO III Gina pahibalo sang aton tagdumalahan nga magabalik na sa orihinal nga opisina ang Sara Area Office (SAO), sa Brgy. Preciosa, Sara, Iloilo sa MARSO 03, 2025 (Lunes). Ang tanan nga katapo-konsumidor sang Sara, Lemery, San Dionisio, Ajuy kag Concepcion ang didto na maga – padulong sa nasambit nga Read more

  • MAY PATIGAYUNON NGA VIRTUAL HEARING ANG ERC SA GINPASAR NGA ERC CASE NO. 2024-017 SA MARSO 27, 2025

    Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in Read more

  • NOTICE TO THE PUBLIC

    Sa tanan nga katapo kunsumidor sang ILECO III Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more