• UNSCHEDULED POWER INTERRUPTION (JANUARY 18, 2023)

    Date: January 18, 2023 Time of interruption: 2:13 PM Time of restoration: 3:20 PM Affected areas: JM Basa St., Pase (portion) and Capinang, San Dionisio, Iloilo Activity: Construction/Insertion of 35 ft steel pole due to sagging three phase line We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 17, 2023)

    Date: January 17, 2023 Time of interruption: 11:05 AM Time of restoration: 1:30 PM Affected area: Brgy. San Salvador, Banate, Iloilo Activity: Replaced rusty steel poles We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 16, 2023)

    Date: January 16, 2023 (Monday )Time of interruption: 1:25 PM Time of restoration: 2:05 PM Affected area: Drancalan, Batad, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ACCREDITED THIRD PARTY COLLECTION CENTERS

    PAHIBALO SA MGA KATAPO-KONSUMIDORES Ang tanan nga individual consumers ang pwede makabayad sa mga masunod nga accredited payment centers:PAYMAYAECPAYLINK.BIZPORTALUNION BANKSEVEN ELEVENFIRST CONSOLIDATED BANK- ESTANCIA BRANCHGCASHBDO NETWORK BANK- ESTANCIA AND SARA BRANCHRD PAWNSHOPM LHUILLIERUNIFIED GPRSPALAWAN PAWNSHOPRURAL BANK OF ANILAO, INC.BDO UNIBANKRCBC Samtang ang tanan nga BAPA Members ang kinahanglan nga magbayad sa inyo natungdan nga BAPA.… Read more

  • JOIN THE BIGGEST HOUR FOR EARTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the biggest hour for Earth. EARTH HOUR! Let’s switch off later 8:30 PM – 9:30 PM, this will help Earth recover for our future. Read more

  • LOOK: ILECO III personnel conducted BAPA Meeting in Brgy. Calangag, Batad, Iloilo with 36 attendees on March 22, 2023 (Wednesday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • LOOK: ILECO III CONDUCTED BARANGAY POWER ASSOCIATION (BAPA) AREA MEETING AND METER READER SKILLS ENHANCEMENT SEMINAR

    System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more