• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 1, 2023)

    Date: February 01, 2023 (Wednesday) Time of interruption: 2:00 PM Time of restoration: 3:10 PM Affected area: Poblacion, Anilao, Iloilo (portion) Activity: Installed correctional pole We apologize for the inconvenience. For your information. Read more

  • THERMAL SCANNING OF DISTRIBUTION LINES

    ILECO III Technical Team conducted Thermal scanning of Distribution Lines to determine hotspots of distribution lines and to reduce system loss today, January 31, 2023 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 31, 2023)

    Date: January 31, 2023 Time of interruption: 11:30 AM Time of restoration: 3:25 PM Affected area: Trinidad Village, Poblacion, Barotac Viejo, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • ACCREDITED THIRD PARTY COLLECTION CENTERS

    PAHIBALO SA MGA KATAPO-KONSUMIDORES Ang tanan nga individual consumers ang pwede makabayad sa mga masunod nga accredited payment centers:PAYMAYAECPAYLINK.BIZPORTALUNION BANKSEVEN ELEVENFIRST CONSOLIDATED BANK- ESTANCIA BRANCHGCASHBDO NETWORK BANK- ESTANCIA AND SARA BRANCHRD PAWNSHOPM LHUILLIERUNIFIED GPRSPALAWAN PAWNSHOPRURAL BANK OF ANILAO, INC.BDO UNIBANKRCBC Samtang ang tanan nga BAPA Members ang kinahanglan nga magbayad sa inyo natungdan nga BAPA.… Read more

  • JOIN THE BIGGEST HOUR FOR EARTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the biggest hour for Earth. EARTH HOUR! Let’s switch off later 8:30 PM – 9:30 PM, this will help Earth recover for our future. Read more

  • LOOK: ILECO III personnel conducted BAPA Meeting in Brgy. Calangag, Batad, Iloilo with 36 attendees on March 22, 2023 (Wednesday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • LOOK: ILECO III CONDUCTED BARANGAY POWER ASSOCIATION (BAPA) AREA MEETING AND METER READER SKILLS ENHANCEMENT SEMINAR

    System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more