• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa HUNYO 03, 2026 (MIYERKULES), 7:30 AM- 4:30 PM (9 ka oras ang kalawigon) para sa pag-relocate sang mga poste, pag-clearing sang linya kag iban pa nga technical activities. Ang mga lugar nga apektado sang sini nga power interruption amo ang mga masunod:… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa HUNYO 07, 2026 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini nga power interruption amo… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Load Shedding due to NGCP’s Manual Load Drop Date: June 2, 2026 (Tuesday) Time of power interruption: 5:00 p.m. Time of power restoration: 7:21 p.m. Areas Affected :Sara Feeder 3Municipality of SaraApologista (Portion), Bakabak, Crespo, Ferraris, Gildore (Portion), Lanciola, Padios, Poblacion Ilawod (Portion), Salcedo, Zerrudo Municipality of ConcepcionCalamigan (Portion) Cause of power interruption: Manual… Read more

  • ENERGY SAVING TIP

    Pag-kontrol sang konsumo sang kuryente. Read more

  • ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more

  • REQUIREMENTS OF CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ENERGY SAVING TIP

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more