NGCP’s EMERGENCY POWER ADVISORY

by

What: Load Shedding due to NGCP’s Manual Load Drop

Date: June 2, 2026 (Tuesday)

Time of power interruption: 5:00 p.m.

Time of power restoration: 7:21 p.m.

Areas Affected :
Sara Feeder 3
Municipality of Sara
Apologista (Portion), Bakabak, Crespo, Ferraris, Gildore (Portion), Lanciola, Padios, Poblacion Ilawod (Portion), Salcedo, Zerrudo

Municipality of Concepcion
Calamigan (Portion)

Cause of power interruption: Manual Load Drop (MLD) of NGCP to maintain the integrity of the Visayas power grid due to unavailability of Visayas’ large coal plants.

This power interruption due to manual load dropping is beyond the control of ILECO III.