• UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 10:00 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 9:55 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • NGCP MANUAL LOAD DROPPING

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga naga-implementar sang ROTATING POWER INTERRUPTION ang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of the Philippines (NGCP). Ang apektado sang rotational power interruption amo ang mga masunod nga lugar:ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, AJUY, SARA, LEMERY, CONCEPCION, SAN DIONISIO,… Read more

  • ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more

  • REQUIREMENTS OF CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ENERGY SAVING TIP

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • FEAST OF SAN JUAN DE BAUTISTA

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Saranhon” and “Banatenhon” in their celebration of Feast of San Juan De Bautista an Annual Town Fiesta, June 24, 2023 (Saturday). Happy Fiesta mga ka Member-Consumer-Owners! Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more