• UNSCHEDULED POWER INTERRUPTION (APRIL 3, 2023)

    Date: April 03, 2023 Time of interruption: 11:50 AM Time of restoration: 2:33 PM Affected area: Banban, Batad, Iloilo Cause: Line fault due to animal contact (gecko) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA ABRIL 12-15 KAG 17, 2023

    Pahibalo sa mga katapo-konsumidores nga may serye sang SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang mga masunod: ABRIL 12, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)BAROTAC VIEJO• Sitio Tigbao, Nueva • Invencion ABRIL 13,… Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 1, 2023)

    DATE: April 01, 2023 Time of interruption: 6:14 PM Time of restoration: 7:29 PM Affected areas: Proper, Brgy. Cabalic, Balasan Activity: Replace secondary jumper cut-off We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more

  • REQUIREMENTS OF CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ENERGY SAVING TIP

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • FEAST OF SAN JUAN DE BAUTISTA

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Saranhon” and “Banatenhon” in their celebration of Feast of San Juan De Bautista an Annual Town Fiesta, June 24, 2023 (Saturday). Happy Fiesta mga ka Member-Consumer-Owners! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more