
POWER RATES
POWER ADVISORIES
Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more
What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more
ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more
NEWS AND UPDATES
ILECO III in partnership with Northern Iloilo State University (NISU)-Department of Energy and Affiliated Renewable Energy Center (AREC) successfully conducted an Information Education Campaign (IEC) Activity and Seminar on Power Industry and Renewable Energy to 159 students and faculty of Northern Iloilo State University (NISU)-Victorino Salcedo Sara Campus on August 22, 2023 in NISU Gymnasium,… Read more
LOOK: Presyo sang Kuryente sang ILECO III, Padayon sa pagnubo sa bulan sang AGOSTO 2023 Read more
Avoid overnight charging. Read more
This is in line with NEA’s mandate of “Total Electrification by 2028”, and also part of System’s Loss reduction program of the cooperative. The activity kick-off with a short program to thank our Member-Consumer-Owners and its stakeholders of their valuable participation and cooperation resulting to be recognized as one of the Most Outstanding Electric Cooperative… Read more
BIDS AND NOTICES
Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more