• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa HUNYO 07, 2026 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini nga power interruption amo… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Load Shedding due to NGCP’s Manual Load Drop Date: June 2, 2026 (Tuesday) Time of power interruption: 5:00 p.m. Time of power restoration: 7:21 p.m. Areas Affected :Sara Feeder 3Municipality of SaraApologista (Portion), Bakabak, Crespo, Ferraris, Gildore (Portion), Lanciola, Padios, Poblacion Ilawod (Portion), Salcedo, Zerrudo Municipality of ConcepcionCalamigan (Portion) Cause of power interruption: Manual… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Load Shedding due to NGCP’s Manual Load Drop Date: June 1, 2026 (Monday) Time of power interruption: 6:58 p.m. Estimated time of power restoration: Not yet determined Areas Affected : Feeder 2 of Daan Banwa Substation (Municipality of Estancia Botongon, Poblacion Zone 1, Poblacion Zone II, Poblacion Zone III) Cause of power interruption: Manual… Read more

  • BAPA MEETING AND IEC IN BRGY. CALANGAG, BATAD

    LOOK: ILECO III personnel together with Dir. Melly L. De Asis, Board of Director of District IV (Batad and Estancia) conducted BAPA Meeting and Information Education Campaign (IEC) in Calangag, Batad with 56 attendees on February 15, 2024 (Thursday). This meeting was conducted to inform the members of the status of the BAPA operation and… Read more

  • BAPA MEETING AND IEC IN BRGY. MILAN LEMERY

    LOOK: ILECO III Personnel conducted BAPA Meeting and Information Education Campaign (IEC) attended by 34 BAPA Members with Sitio Campo, Milan, Lemery, Iloilo on February 14, 2024. It was also attended by Punong Barangay Hon. Noel B. Mollemo. For your information. Read more

  • HAPPY VALENTINE’S DAY

    With every spark, our gratitude for our member-consumer-owners shines brighter. Happy Valentine’s day our valued Member-Consumer-Owners (MCOs) #ILECO3CorporateSocialResponsibility #ILECO3ServiceBeyondElectricity #ILECO3LoveWattsWeShare Read more

  • LOOK: ILECO III ATTENDED ABC MEETING IN SAN RAFAEL, ILOILO

    ILECO III employees appeared during the ABC Meeting in San Rafael, Iloilo held at Liga Office on February 13, 2024 (Tuesday). The said appearance intends to update the Punong Barangays of the said municipality of the programs of ILECO III pertaining to electrification and at the same time encourage them to be participative in all… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more