• RE-SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP)

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) SA MAYO 3, 2025

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO) 6:00 AM- 6:00… Read more

  • EMERGENCY POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa ABRIL 23, 2025 (MIYERKULES) 5:00 AM- 6:00 AM (1 ka oras ang kalawigon) para sa pag-ilis sang insulator sa Poblacion Sur, Balasan kag hot spot correction sa Poblacion, Carles. Ang lugar nga apektado sang sini nga power interruption amo ang masunod: Balasan:… Read more

  • HAPPY FATHER’S DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates Father’s Day, June 19, 2022 Happy Father’s Day to all (Tatay, Papa, Dad, Erpat) Read more

  • Happy Father’s Day sa tanan nga mga Tatay, Papa kag Daddy!

    Kamo ang matuod nga kusog kag haligi sang aton mga puluy-an. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3CorporateSocialResponsibility#ILECO3ServiceBeyondElectricity ILECO III distributed tokens to honor the contribution of all Fathers in the society. *Masks were removed for documentation purposes only. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • IEC PROGRAM AND BAPA GENERAL ASSEMBLY IN SITIO HAMBAD, VISTA ALEGRE, BAROTAC VIEJO

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Sitio Hambad, Vista Alegre, Barotac Viejo, Iloilo attended by 75 MCOs on June 17, 2022 (Friday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more