• SCHEDULED PREVENTIVE MAINTENANCE SA BANWA SANG ANILAO, BANATE, BAROTAC VIEJO, KAG SAN RAFAEL SA OKTUBRE 20, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 2 sa Dingle Substation sa OKTUBRE 20, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: OKTUBRE 20, 2024 (DOMINGO) 6:00 AM- 6:00 PM Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: October 03, 2024 (Thursday) Time of interruption: 6:33 AM Estimated time of restoration: NOTE YET DETERMINED Affected areas: Bulak Sur and Alapasco, Batad, Iloilo Cause: Replacement of poles For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 29, 2024 (Sunday) Time of interruption: 9:49 AM Time of restoration: 10:23 AM Affected area: Brgy. Pasig, Juaneza and Aposaga, Sara Cause: Vegetation (Bamboo Tree) on Pole Number 0335 of SF1 Activity: Pole to Pole Inspection of primary line, refusing and clearing of line. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more