• Unscheduled Power Interruption

    Date: October 14, 2024 (Monday) Time of interruption: 6:56 PM Time of restoration: 7:17 PM Affected area: Sara Substation Feeder 4 Whole municipality of Lemery Portion of Sara Cause of power interruption: Damaged cut-out at Brgy. Arante, Sara, Iloilo For your information. Read more

  • EMERGENCY POWER INTERRUPTION

    Date: October 14, 2024 (Monday) Time of interruption: 12:00 NN Estimated time to be restored: 1:00 PM Duration: 1 hour Affected areas: Whole Municipality of San Dionisio Sara (Anoring, Devera, Aldeguer & Castor) Aglosong, Concepcion Cause of interruption: Replacement of damaged steel pole hit by a vehicle at Brgy. Anoring, Sara For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG LEMERY, SAN DIONISIO, SARA KAG CONCEPCION SA OKTUBRE 12, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 12, 2024 (SABADO), 5:00 AM- 6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga preventive maintenance sang Sara Substation, pag-ilis sang poste kag steel pins kag clearing sang linya. Ang lugar nga apektado sang sini nga power interruption amo Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more