• EMERGENCY POWER INTERRUPTION TODAY, JULY 8, 2022

    Date: July 08, 2022 (Friday) Time of interruption: 9:07 AMTime of restoration: 9:21 AM Affected areas: Batad (All barangays) and Estancia (portion) Activity: Replacement of damaged pin insulator and suspension insulator in Calapdan, Estancia We apologize for the inconvenience. For your information. Read more

  • MANUAL LAOD DROPPING (MLD) SANG NGCP SUBONG NGA HULYO 7, 2022

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga mag-preparar sa POSIBLE magaluntad nga power interruption sa inyo nga lugar nga magadugay sang 1-2 oras sugod subong nga gab-I, Hulyo 07, 2022 (Huwebes) para sa pag-implementar sang ROTATING POWER INTERRUPTION sang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of… Read more

  • REFILLING OF SF6 GAS IN DAAN BANWA 69KV CIRCUIT BREAKER TODAY, JULY 7, 2022

    ILECO III personnel conducted and facilitated refilling of SF6 Gas in Daan Banwa 69kv Circuit Breaker, today, July 07, 2022 (Thursday), 12:00 NN- 1:00 PM. We apologize for the inconvenience. For your information. Read more

  • HAPPY VALENTINES DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates Valentines Day together with all the Member-Consumer-Owners (MCO) who are in love, being love and everyday who knows love despite all the struggles and challenges they’ve experienced. Let’s show the world that LOVE is always upon us and together we can change our world to be a better place.… Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more