• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 3:33 PMTime of Restoration: 4:41 PM Cause of interruption: Line fault due to damaged pin insulator in front of PET Gasoline Station Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 10:05 AMTime of Restoration: 10:44 AM Cause of interruption: Transient line fault Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 6:40 PM Time of Restoration: 7:45 PM Affected Area: Villahermosa, Sara, Cabantohan, Dapdapan, Omio, Marapal, Alcantara, Yawyawan, Layog Bato and Sitio Talaytay, Poblacion, Lemery Activity: Duplex wire contacted primary line due to vehicular incident in Brgy. Arante, Sara We apologize for the inconvenience. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more