• SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 3, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 03, 2023 (SABADO)6:00 AM- 6:00 PM (12 ka oras ang kalawigon)•… Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 29, 2023)

    Date: May 29, 2023 Time of interruption: 8:18 AM Time of restoration: 11:24 AM Affected area: Sitio Minoro, Bancal, Carles, Iloilo Activity: Replaced damaged bare wire We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 29, 2023)

    Date: May 29, 2023 Time of interruption: 12:50 PM Time of power restoration: 1:23 PM Cause: Line fault due to vegetation We apologize for the inconvenience. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more