• UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 10:55 AM Time of restoration: 11:28 AM Affected areas: Gomez St., Poblacion, Carles Action Taken: Inspection of secondary line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 4:04 AM Time of restoration: 9:31 AM Affected areas: C. Pedrana and S. Ganzon St., Poblacion, Balasan Action Taken: Repaired connection and repaired two (2) pieces damaged transformer bushing We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 24, 2023)

    Date: August 24, 2023 (Thursday) Time of interruption: 9:38 AM Time of restoration: 10:05 AM Affected areas: Calog, Poblacion, San Dionisio Action Taken: Installation of private transformer We apologize for the inconvenience. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more