• UNSCHEDULED POWER INTERRUPTION (APRIL 29, 2022)

    Date: April 29, 2022 (Friday) Time of interruption: 9:25 AM Time of restoration: 11:00 AM Affected area: Brgy. Bagacay, Sara, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • UPDATE ON NGCP’S EMERGENCY POWER INTERRUPTION (As of 7:30 a.m.)

    Pahibalo sa mga katapo-konsumidores nga padayon sa gihapon ang pag-ubra sang National Grid Corporation of the Philippines (NGCP) sa pag trouble shoot sang circuit breaker sa NGCP Concepcion Substation. Sa sini nga bahin, ang power supply wala nabalik sa aton nga distribution lines sa natalana nga schedule kaina nga alas 7:00 sang aga. Padayon ang… Read more

  • SCHEDULED MANUAL LOAD DROPPING SANG NPC SA GIGANTES ISLAND

    Pahibalo sa mga katapo-konsumidores sa Gigantes Island sa mga nagluntad nga Power Interruption umpisa sang ABRIL 26, 2022 nga ini ang may kaangtangan sa Scheduled Manual Load Dropping sang National Power Corporation (NPC). Base sa sulat nga nabaton sang opisina halin sa NPC sang ABRIL 27, 2022, ang nasambit nga power load dropping ang ginpatigayon… Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • HAPPY VALENTINES DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates Valentines Day together with all the Member-Consumer-Owners (MCO) who are in love, being love and everyday who knows love despite all the struggles and challenges they’ve experienced. Let’s show the world that LOVE is always upon us and together we can change our world to be a better place.… Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more