• SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA ENERO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA TR1 sa Concepcion Substation sa ENERO 15, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:4:00 AM- 5:00 AM (1 ka oras ang… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 10, 2023)

    Date: January 10, 2023 Time.of interruption: 8:09 PM Time of restoration: 8:43 PM Affected area: St. Therese Village, Dayhagan, Carles, Iloilo Activity: Repaired secondary neutral bushing loose connection of transformer We apologize for the inconvenience. For your information. Read more

  • REHAB OF KWHR METERS IN BRGY. MERCED, BANATE

    ILECO III conducted rehab of 11 kwhr meters due to burned source side in Brgy. Merced, Banate, Iloilo today, January 10, 2023. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more