• UNSCHEDULED POWER INTERRUPTION

    Date: August 08, 2024 Time of power interruption: 6:33 AM Time of restoration: 8:19 AM Affected areas: Bondulan (portion), Poblacion (portion) & Siempreviva (portion), San Dionisio, Iloilo Cause: Line fault due to animal contact For your information. Read more

  • EMERGENCY POWER INTERRUPTION

    Date: August 07, 2024 (Wednesday) Time of power interruption: 9:30 AM Estimated time of power restoration: 12:00 NN Duration: 2 hours and 30 minutes Affected area: Proper, Anoring, Sara, Iloilo Cause of power interruption: Installation of distribution transformer For your information. Read more

  • EMERGENCY POWER INTERRUPTION

    Date: August 05, 2024 (Monday) Time of power interruption: 5:45 PM Estimated time of power restoration: NOT YET DETERMINED Affected areas: Daan Banwa Feeder 3 Municipality of Batad Alapasco, Alinsolong, Banban, Batad Viejo, Binon-an, Bolhog, Bulak Norte, Bulak Sur, Cabagohan, Calangag, Caw-i, Drancalan, Embarcadero, Hamod, Malico, Nangka, Pasayan, Poblacion, Quiazan Florete, Quiazan Lopez, Salong, Santa Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more