• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 7:44 AM Estimated time of restoration: 8:50 AM Affected area/s: Brgy. Dapdapan and Cabantohan, Lemery Activity: Inspection/repaired sectionalizing cut-out of Phase C located at Brgy. Arante and replaced busted fuse link due to heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 12:05 NN Estimated time of restoration: 1:27 PM Affected area/s: Brgy. Ferraris, Sara Activity: Inspection/repaired sectionalizing cut-out and replaced busted fuse link and fuse tube at Brgy. Ferraris, Sara due to Phase C trip-off. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 7, 2023)

    Date: November 7, 2023 (Tuesday) Time of interruption: 2:31 PM Estimated time of restoration: 3:03 PM Affected area/s: Sitio Pulacan West, Luca, Ajuy Activity: Inspection and replaced busted fuse link due to animal contact We apologize for the inconvenience. For your information. Read more

  • ILECO III IS NOW CERTIFIED ISO 9001:2015

    ILECO III successfully PASSED the ISO Standards Certification Audit ISO 9001:2015 QMS with zero Major Non-Conformance on February 9-10, 2023 with almost a year of preparations, documentations and internal quality audit. Being an ISO means that we value implementing and maintaining Quality Management System to ensure that we meet our Member-Consumer-Owners’ & stakeholders’ needs within… Read more

  • EVELIO JAVIER DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more

  • ILECO III SCHEDULE OF DUE DATES AND DISCONNECTION

    Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more