
POWER RATES
POWER ADVISORIES
Date: October 13, 2022 Time of interruption: 10:11 AM Time of Restoration: 12:18 NN Affected Area: Sitio Bairan, San Carlos, Anilao Reason/Activity: Load Splitting and Install additional 25kVA distribution transformer We apologize for the inconvenience. For your information. Read more
ILECO III Technical personnel conducted replacement of defective/stop kWhr meter at Salong, Ipil, Balasan and St. John and St. Therese NHA Village, Carles today, October 13, 2022 (Thursday). No power interruption occurred. Keep safe Warriors of Light For your information. Read more
Date: October 13, 2022 Time of interruption: 7:50 AM Time of Restoration: 11:34 AM Affected Area: Sitio Apo, San Andres, San Rafael Reason/Activity: Repair secondary lines cut-off We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
ILECO III conducted On-site Pre-Membership Seminar for prospected MCOs at NHA Village, Barangay Dalipe, Lemery yesterday February 27, 2023 (Monday) together with Barangay Electrician Association. It was attended by Ninety Two (92) MCOs and Barangay Officials of Brgy. Dalipe, Lemery. Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more