
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Concepcion-Estancia Transmission Line sa PEBRERO 10, 2024 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 6:00 AM- 7:00 AM (1 ka oras ang kalawigon)KAG5:00 PM- 6:00 Read more
Date: February 03, 2024 (Saturday)Time of interruption: 12:00 NNEstimated time of restoration: Within one (1) hour Affected area: Feeder 1 of Ajuy Substation Ajuy S/s Feeder 1 *CONCEPCIONAgnagaBacjawan Norte (Portion)Bacjawan SurBatitiCalamigan (Portion)Jamul-awonLo-ongMacalbangNinoNipaPlandicoPoblacionTamis-ac *AJUYBucana BunglasRojasPuente BunglasSilagonLanjagan (Portion)Pantalan Navarro Activity: To trouble shoot 69kV circuit breaker We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa PEBRERO 03, 2024 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BALASAN amo ang masunod:• Bacolod• Batuan• Cabalic• Dolores• Gimamanay• Malapoc• Poblacion Read more
NEWS AND UPDATES
ILECO III conducted On-site Pre-Membership Seminar for prospected MCOs at NHA Village, Barangay Dalipe, Lemery yesterday February 27, 2023 (Monday) together with Barangay Electrician Association. It was attended by Ninety Two (92) MCOs and Barangay Officials of Brgy. Dalipe, Lemery. Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more
Stay up to date on maintenance to save energy. Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more