• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • LOOK: ILECO III nagapabilin nga ISO 9001:2015 Certified sa ika-duwa nga Surveillance Audit sang DQS Philippines.

    Sa ginpatigayon nga ISO Surveillance sang DQS Certification Phils., Inc. and IQNET LTD sang Pebrero 27, 2025 (Huwebes), liwat nga madinalag-on nga malampuwasan sang ILECO III ang nasambit nga audit sa diin nagapabilin nga labing una kag naga-isahanon nga power distribution utility sa Western Visayas nga ISO Certified. Ini bangud sang epektibo nga pag-implementar kag… Read more

  • PUBLIC ADVISORY PRESS RELEASE

    PAHIBALO SA MGA KATAPO-KUNSOMIDOR SANG ILECO III Gina pahibalo sang aton tagdumalahan nga magabalik na sa orihinal nga opisina ang Sara Area Office (SAO), sa Brgy. Preciosa, Sara, Iloilo sa MARSO 03, 2025 (Lunes). Ang tanan nga katapo-konsumidor sang Sara, Lemery, San Dionisio, Ajuy kag Concepcion ang didto na maga – padulong sa nasambit nga… Read more

  • MAY PATIGAYUNON NGA VIRTUAL HEARING ANG ERC SA GINPASAR NGA ERC CASE NO. 2024-017 SA MARSO 27, 2025

    Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in… Read more

  • NOTICE TO THE PUBLIC

    Sa tanan nga katapo kunsumidor sang ILECO III Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot… Read more