• REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO) Read more

  • NGCP’s SCHEDULED POWER INTERRUPTION

    Date: May 03, 2025 (Saturday) Time: 2:00 AM-2:00 PM (12 hour duration) Affected areas: ANILAO, BANATE, BAROTAC VIEJO & SAN RAFAEL For your information. Read more

  • RE-SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP)

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO) Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more