Date: September 6, 2022
Time of interruption: 5:45 PM
Time of Restoration: 6:00 PM
Affected Area: Sitio Carrida, San Lucas, Barotac Viejo
Activity: Repair secondary load due to loose connection of side DX Transformer Supply 37.5 kVa and private transformer load side connection.
We apologize for the inconvenience.
For your information.




