UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 6, 2022)

by

Date: September 6, 2022

Time of interruption: 5:45 PM

Time of Restoration: 6:00 PM

Affected Area: Sitio Carrida, San Lucas, Barotac Viejo

Activity: Repair secondary load due to loose connection of side DX Transformer Supply 37.5 kVa and private transformer load side connection.

We apologize for the inconvenience.

For your information.