What: Load Shedding due to NGCP’s Manual Load Drop
Date: June 3, 2026 (Wednesday)
Time of power interruption: 5:19 PM
Estimated time of power restoration: 6:22 PM
Areas Affected :
Banate Feeder 3
Municipality of Banate-
Bariga, Bobon, Carmelo (Portion), De La Paz, Juanico, Libertad, Magdalo, Managopaya
Cause of power interruption: Manual Load Drop (MLD) of NGCP to maintain the integrity of the Visayas power grid due to unavailability of Visayas’ large coal plants.
This power interruption due to manual load dropping is beyond the control of ILECO III.

