EMERGENCY POWER ADVISORY

by

What: Load Shedding due to NGCP’s Manual Load Drop

Date: June 10, 2026 (Wednesday)

Time of power interruption: 2:00 PM

Estimated time of power restoration: 6:04 PM

Areas Affected :

Ajuy Feeder 2

Municipality of Ajuy:

Adcadarao, Agbobolo, Badiangan, Barrido, Bato Biasong, Bay-ang, Central, Culasi, Lanjagan (Portion), Luca, Malayu-an, Mangorocoro, Pantalan Nabaye, Pedada, Pili, Pinantan Diel, Pinantan Elizalde, Pinay Espinosa, Poblacion, Progreso San Antonio, Santo Rosario, Taguhangin, Tanduyan, Tipacla, Tubogan

Municipality of Sara:

Batitao, Gildore (Portion)

Cause of power interruption:

Manual Load Drop (MLD) of NGCP to maintain the integrity of the Visayas power grid due to unavailability of Visayas’ large coal plants.

This power interruption due to manual load dropping is beyond the control of ILECO III