• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 09, 2025 (Friday) Time of power interruption: 6:02 PM Estimated time of power restoration: 6:32 PM Duration: 30 minutes Cause: Repair of damaged primary jumper cut-off Affected areas: Municipality of Sara Aguirre Antonio Yusay/PasigApologista (Portion) Aspera Ardemil Bato Del Castillo Domingo Juaneza Latawan Malapaya MuycoPoblacion Ilaya Poblacion Market Poblacion Ilawod Tady For your… Read more

  • ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • HAPPY BIRTHDAY VICE GOVERNOR GARIN!

    Happy birthday to Hon. Christine S. Garin, Vice Governor, Province of Iloilo. Wishing you all the best in life and may God bless you always. From ILECO III Family! Christine Tingting Garin Read more

  • 31ST AGMA LIVE FEED

    https://www.facebook.com/watch/live/?ref=watch_permalink&v=756852255897340 Read more

  • MGA DAPAT TANDAAN SA 31ST VIRTUAL AGMA

    Pahanumdom sa tanan nga Katapu-Kunsomidor sang ILECO III para sa palaabuton nga 31st Virtual Annual General Membership Assembly. Read more

  • EID AL-FITR

    ILOILO III ELECTRIC COOPERATIVE, INC. joins with all Muslim Member-Consumer-Owners’ in celebrating Eid al-Fitr, April 21, 2023. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more