
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
This is a platform in which Electric Cooperatives in the entire country are being recognized for their dedication, support and excellent performance. It was attended by 121 electric cooperatives represented by more than 1,500 delegates. The following awards were accepted by the Board of Directors headed by Dir. Villa B. Gumban, General Manager Atty. James… Read more
Avoid overloading of outlets. Read more
ILECO III Board of Directors attending the 54th NEA Founding Anniversary, 2023 NEA-EC Convergence and 14th National Electrification Awareness Month (NEAM) with this year’s theme: “Total Electrification by 2028” in Philippine International Convention Center, Pasay City, Metro Manila on August 09-11, 2023. Read more
BIDS AND NOTICES
Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more
Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more