• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 09, 2025 (Friday) Time of power interruption: 6:02 PM Estimated time of power restoration: 6:32 PM Duration: 30 minutes Cause: Repair of damaged primary jumper cut-off Affected areas: Municipality of Sara Aguirre Antonio Yusay/PasigApologista (Portion) Aspera Ardemil Bato Del Castillo Domingo Juaneza Latawan Malapaya MuycoPoblacion Ilaya Poblacion Market Poblacion Ilawod Tady For your… Read more

  • ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • Dapat naton e-consider bag-o kita mag-attend sa aton ika-33rd Annual General Membership Assembly o AGMA sa Abril 12, 2025

    Tandaan ang mga tips sa idalom agud maproteksyunan ka sa init, uhaw kag dal-on lamang ang mga importante nga bagay sa ti-on sang aktibidad. Madamo guid nga salamat ka-MCO! Magkilita-ay kita liwat kag magda-ug sang dalagko nga papremyo halin sa inyo kooperatiba. Ang nagapahibalo, ATTY. JAMES G. BALSOMO II, MBA, DM Read more

  • 6 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • 7 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • 8 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more