• UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 7:10 AM Time of restoration: 8:00 AM Affected areas: Salong, Batad Action Taken: Inspection of primary line, pull-out animal contact (bird) and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 10:55 AM Time of restoration: 11:28 AM Affected areas: Gomez St., Poblacion, Carles Action Taken: Inspection of secondary line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 4:04 AM Time of restoration: 9:31 AM Affected areas: C. Pedrana and S. Ganzon St., Poblacion, Balasan Action Taken: Repaired connection and repaired two (2) pieces damaged transformer bushing We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Avoid overnight charging. Read more

  • FEAST OF IMMACULATE CONCEPTION

    Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang DISYEMBRE 8, 2023 (BIYERNES), ang gin-deklara nga SPECIAL NON-WORKING HOLIDAY sa bug-os nga pungsod, para sa pag-obserba sang “IMMACULATE OF CONCEPTION OF MARY” base sa Proclamation No. 368 S. 2023. Bangud sini, SARADO ang ILECO III Main Office kaupod ang Area Offices (Sara, Natividad kag Pani-an). May ara sang… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more