
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 29, 2024 (DOMINGO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Pani-an Substation, clearing sang linya, kag pag-ilis sang poste. Ang lugar nga apektado sang sini nga power interruptions amo ang masunod: • CARLES… Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 28, 2024 (SABADO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Daan Banwa Substation, clearing sang linya, pag-ilis sang poste kag pag convert sang linya. Ang lugar nga apektado sang sini nga power interruptions… Read more
Date: September 21, 2024 (Saturday) Time of interruption: 6:35 AM Time of restoration: 7:56 AM Affected area: Municipality of Carles Cause: Damage of Pole Number 73 on its Pin Insulator Activity: Pole to Pole Inspection and replaced damage pin insulator For your information. Read more
NEWS AND UPDATES
DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more
For your information. Read more
𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more