• UNSCHEDULED POWER INTERRUPTION (APRIL 12, 2023)

    Date: April 12, 2023 Time of interruption: 6:34 PM Time of restoration: 7:15 PM Affected area: Bulak Norete, Batad, Iloilo Cause: Line fault due to vegetation (bamboo) We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 12, 2023)

    Date: April 12, 2023 Time of interruption: 6:15 PM Time of restoration: 7:06 PM Affected area: Sitio Tacayay, San Florentino, San Rafael, Iloilo Cause: Line fault due to vegetation (coconut leaves) We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 12, 2023)

    Date: April 12, 2023 Time of interruption: 9:45 AM Estimated time of restoration: NOT YET DETERMINED Affected areas: Calapdan, Lonoy and Lumbia, Estancia, Iloilo Cause: Line fault due to vegetation (bamboo) We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more