• NGCP’s UNSCHEDULED POWER INTERRUPTION (JULY 5, 2023)

    DATE: July 05, 2023 (Wednesday) Time of interruption: 4:31 AM Estimated Time of power restoration: NOT YET DETERMINED Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP for the power restoration. We apologize for the inconvenience. For your information.  Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 3, 2023)

    Date: July 03, 2023 Time of interruption: 8:05 AM Time of restoration: 8:20 AM Affected area: Batad Municipal Building Action taken: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HULYO 12-13, 2023 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BALASAN amo ang masunod: HULYO 12, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Kinalkalan HULYO 13, 2023 (HUWEBES)8:00 AM- 5:00… Read more

  • NOTICE TO THE PUBLIC Sa tanan nga katapo kunsumidor sang ILECO III

    Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in… Read more

  • LOOK: ILECO III nagapabilin nga ISO 9001:2015 Certified sa ika-duwa nga Surveillance Audit sang DQS Philippines.

    Sa ginpatigayon nga ISO Surveillance sang DQS Certification Phils., Inc. and IQNET LTD sang Pebrero 27, 2025 (Huwebes), liwat nga madinalag-on nga malampuwasan sang ILECO III ang nasambit nga audit sa diin nagapabilin nga labing una kag naga-isahanon nga power distribution utility sa Western Visayas nga ISO Certified. Ini bangud sang epektibo nga pag-implementar kag… Read more

  • PUBLIC ADVISORY PRESS RELEASE

    PAHIBALO SA MGA KATAPO-KUNSOMIDOR SANG ILECO III Gina pahibalo sang aton tagdumalahan nga magabalik na sa orihinal nga opisina ang Sara Area Office (SAO), sa Brgy. Preciosa, Sara, Iloilo sa MARSO 03, 2025 (Lunes). Ang tanan nga katapo-konsumidor sang Sara, Lemery, San Dionisio, Ajuy kag Concepcion ang didto na maga – padulong sa nasambit nga… Read more

  • MAY PATIGAYUNON NGA VIRTUAL HEARING ANG ERC SA GINPASAR NGA ERC CASE NO. 2024-017 SA MARSO 27, 2025

    Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more