• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • NGCP’s SCHEDULED POWER INTERRUPTION

    Date: May 03, 2025 (Saturday) Time: 2:00 AM-2:00 PM (12 hour duration) Affected areas: ANILAO, BANATE, BAROTAC VIEJO & SAN RAFAEL For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more