• EMERGENCY PLANT SHUTDOWN SANG NPC-SPUG SA HULYO 13, 2022 TUBTOB HULYO 27, 2022 SA ISLA GIGANTES

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG nga magasugod sa HULYO 13, 2021 (MIYERKULES) tubtob kinse (15) ka adlaw, 7:00 AM- 12:00 NN (lima ka oras ang kalawigon) kag 5:00 PM- 12:00 MN (pito ka oras ang kalawigon) bangud sang load shedding para sa patigayunon nga maintenance… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Wednesday) Time of interruption: 5:50 AM Time of restoration: 7:45 AM Affected areas: Balunos, Guipis and Manganese, Anilao, Iloilo Cause: Line fault due to animal contact (bat) Activities: Inspection of line and pulled out animal We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Tuesday) Time of interruption: 6:30 AM Time of restoration: 7:31 AM Affected areas: San Rafael (All barangays) and Barotac Viejo (portion) Activity: Repaired source of primary section analyzing cut-out We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more