• SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA SETYEMBRE 6, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 6, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert kag pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BAROTAC VIEJO amo ang masunod: • Bugnay • California •… Read more

  • EMERGENCY POWER INTERRUPTION

    Date: September 1, 2024 (Sunday) Time of interruption: 12:00 NN -1:00 PM Affected area/s: Feeder 1 of Daan Banwa Substation Cause of Interruption: Hot Spot Correction on Power Fuse Assembly For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CONCEPCION SA AGOSTO 30, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa AGOSTO 30, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-kuha sang existing poles kag pag-transfer sang secondary lines. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang: • Sitio Punta… Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more